Position the generator cabinet in its designated clean, dry area. Ensure the cooling fans are unobstructed. 2. Tube Stand or Ceiling Suspension Installation
Establish a dedicated peer-to-peer network connection between the PC and the digital detector. drgem x ray service manual install
Verify that the room dimensions match the final approved architectural layout. Ensure adequate clearance for the ceiling support or floor-mounted tube crane tracking. Position the generator cabinet in its designated clean,
Adjust the leveling feet until the tabletop is perfectly horizontal in both longitudinal and lateral axes. Tube Stand or Ceiling Suspension Installation Establish a
DRGEM’s remote diagnosis functionality enables proactive system maintenance, cutting service costs and minimizing downtime. Real-time monitoring allows service teams to identify potential issues before they cause system failures. Enabling and configuring remote diagnostic access during initial installation facilitates this ongoing support.
Use a collimator test tool to verify that the visual light field matches the actual X-ray exposure field to within 2% of the source-to-image distance (SID).
Maintain at least 3.2 feet (1 meter) of clearance around the generator and diagnostic table for service access. Floor Levelness: The floor must be level within ±plus or minus